- Home
- >
- News
- >
- Corporate News
- >
- New Beach Hotel Water Park
New Beach Hotel Water Park
First, the design of the water park should meet the requirements and be reasonable
1. According to the total water volume and cycle time of the park, configure the filtering, disinfection and sterilization equipment of the corresponding specifications (avoid the use of the method of disinfection and sterilization, and stimulate and damage the human skin).
2. Intake, drainage, pipeline layout is reasonable; to achieve timely water intake, drainage smooth, to prevent the emergence of area water.
3. The lighting is set in place to keep the venue bright and without visual blind spots.Guangzhou Feifan Amusement Equipment Co.,Ltd.